WP 4
WP4 is aiming at integrating the developed system components into an optimized BAoBaB system and to develop the integration of such system in the electrical grid.
Objectives
The main objective of this Work Package is to integrate the developed system components of previous work packages into an optimized BAoBaB system and integrate of such system in the electrical grid.
The specific objectives of the Work Package are:
(i) to merge operational modes for energy conversion into an efficient multiple stage operation.
(ii) to develop a battery management system.
(iii) to map the influence of BAoBaB systems on operating the electricity distribution smartly.
to develop an electrode system and a convertor for DC to AC power and vice versa, optimizing the efficiency.
WP4 is divided in 4 main tasks
Task 4.1 System design and operational mode
Task 4.2 Battery management system
Task 4.3 Smart grid integration
Task 4.4 Electrodes and power convertors for optimizing efficiency